Skip to content

What we need before we can quote

A cell enquiry can be answered in a day or it can take a week of questions. The difference is almost always the duty profile: eight pieces of information decide which models are candidates, and none of them appear on a distributor listing.

The enquiry

Eight inputs, and why each one matters

Input Why it is asked
Cell format and envelope Diameter, height and whether prismatic is acceptable. Sets which models are candidates at all.
Capacity target In mAh per cell, or in Wh for the pack. Decides the energy grade.
Current profile Continuous and peak, with how long the peak lasts. Decides the power grade and the thermal design.
Operating temperature range Charging and discharging limits. A rating is only valid inside the manufacturer cut-off.
Charge requirement Maximum charge current and how quickly the pack has to be ready. Often binds before discharge does.
Cycle life expectation Cycles at a stated depth of discharge. Without the depth, a cycle figure is not comparable.
Quantity and delivery pattern First order size and whether it repeats. Drives packing, batching and how the line is allocated.
Destination and required documents Ship-to market and which certificates your customer expects, so the right paperwork is prepared once.

A partial list still gets an answer — it just comes back as a shortlist with assumptions written in, rather than as a quotation.

What ships with an order

  • UN 38.3 test summary matched to the models shipped
  • Safety data sheet matched to the actual shipping configuration
  • Certificates only where the document is held and the model appears in its coverage list
  • Batch identification for traceability where the order is built from one batch

Batching and matching

Cells that share a series string are matched on capacity, internal resistance and open-circuit voltage. An unmatched string drifts: the weakest cell reaches the low-voltage cut-off first, the protection circuit trips, and the pack reads as failed while most of its capacity is still there.

Orders are assembled from a single batch where the size allows it, and the batch is identified so the traceability question has an answer later. If matched sets are required, state it in the enquiry — it changes how the order is put together.

Commercial terms

Why no prices are published

Cell pricing moves with volume, batch and destination. A figure printed on a page would be wrong within weeks, and wrong in a way that wastes everyone's time: the buyer budgets against it, the quotation lands somewhere else, and the conversation starts over.

Commercial terms are quoted per enquiry against the model, the quantity and the ship-to market. Minimum order quantity and lead time are answered the same way, for the same reason — a first order and a repeat order are not the same proposition, and air and sea differ by weeks rather than days.

What can be stated without a quotation is the documentation position: which models carry a manufacturer data sheet, which certificates are held, and which models are still pending. That is published and kept current, because it is the thing that decides whether a design can proceed.

Procurement questions

The six that come up most

Why are no prices published?+
Cell pricing moves with volume, batch and destination, and a figure on a page would be out of date before it was read. Commercial terms are quoted per enquiry against the model, quantity and ship-to market.
Is there a minimum order quantity?+
There is one, and it depends on the model and how it is packed. It is stated with the quotation rather than as a blanket number, because a first order and a repeat order are not the same proposition.
How long does delivery take?+
It is quoted with the order rather than published, because it depends on the model, the quantity and the mode of transport. Air and sea differ by weeks, not days.
Can I get samples before a volume order?+
Yes, so you can run your own testing and approval first. Availability depends on the model, and it is confirmed with the quotation.
Are cells matched before they are packed?+
Cells sharing a series string are matched on capacity, internal resistance and open-circuit voltage. If you need matched sets, say so in the enquiry — it changes how the order is assembled.
What if a model I want is marked pending?+
Pending means no manufacturer data sheet is on file for it. Send the designation and we will say plainly what we hold and what would have to be obtained before you design against those figures.
Do you sell to individuals?+
No. This is a B2B operation — importers, distributors, system integrators, OEM brands and pack builders. There is no consumer checkout on this site.
Are samples available before a volume order?+
Yes — so you can run your own testing and approval before committing volume. Availability depends on the model, so it is confirmed against your enquiry rather than promised in advance.
Can I order one model in several batches?+
Yes, and it is often the better approach for a first product: one batch to qualify, further batches released once the design is fixed. Say so in the enquiry, because it changes how the cells are selected and packed.

Send the duty profile, not the part number

Eight lines of load and envelope, and the shortlist comes back with the documentation behind each candidate.

Start an enquiry
WhatsApp